later than planned or expected
позже, чем планировалось или ожидалось (pozhe chem planirovalos ili ozhidalos)
"The flight is behind schedule because of the storm."
"Рейс отстал от расписания из-за шторма." (Reys otstal ot raspisaniya iz-za shtorma)
to suddenly become very angry or lose control
to take control or responsibility for something
very stupid or slow-witted
at the peak of activity or progress
to think in a similar way as someone else
to work very hard to achieve something